top of page

Case Studies Section

Real projects. Real results.

At MCB Electrical & Design, we don’t just carry out electrical work — we solve problems, improve safety, and deliver long-term solutions.

Our case studies showcase industrial and commercial projects including EICR inspections, fault finding, system upgrades and full electrical redesigns.

From identifying critical issues to delivering compliant, high-quality installations, this is the standard we bring to every job.

Case Studies 

b55e2bdd-6ffe-4497-ba19-f84c7eb5471b_edited.jpg

Before :

Unsafe electrical installation exposed to moisture and failure risk

IMG_0848.jpg

After:

New industrial electrical installation with containment and IP-rated (water resistant) protection

54bbec2a-9480-4c87-ba31-929bd911daca.jpg

Before:

Outdated MCCB panel installation identified during EICR inspection

e76910a3-8f3d-4ab5-b22d-d17d031d3e61.jpg

After:
New Schneider distribution board with compliant protection systems installed

50a2ab6d-c0d8-4535-923a-0c442fe83152.jpg

Before:

Existing distribution board with outdated equipment identified during inspections.

b567a54d-a3ce-4783-967f-f1b7547be09a.jpg

After:

New Schneider distribution board installed with improved protection and organisation.

Emergency and safety lighting installation under escalator Sevenoaks
Before:
Unlit access area beneath escalator with no fixed lighting provision.
Industrial electrical installation and distribution panels commercial site Kent
After:
New lighting installation achieving 200 lux with emergency lighting for compliance
bottom of page